| |
Minimum
cure temperature: N/A
Specific Gravity (water=1): 1.4 +0.1 g/cm
Drying time(dust free): 30 mins at 28OC
Min interval before over coating: 2 hours at 28oC
APPLICATION
DATA
Application surface:
Cement, brickwork, wall board, asbestos
Surface preparation: free from dust, grease and contaminants
Method of application: Roller/ brush
Mixing ratio (with hardener): N/A
Shelf life: 12 months under adequate storage
Condition
|
|
|